Manufacturing Cost Analysis by Activity

Avatar photoCustomer Questions & Answers 7 replies

We need a report that breaks down item costs by cost element and attributes the costs to specific manufacturing activities, using up to five activities for comparison. Which report provides this view?

7 replies

  • Support Enginatics

    Use the CAC Item Cost Break-Out by Activity report. This report is specifically designed to show item costs by cost element, using up to five entered activities.

  • What is the critical prerequisite setup within EBS for this report to actually display activity costs?

  • Support Enginatics

    For this report to show your activity costs, you must first define your activities and then associate your sub-elements by activity. The report logic relies on these Resource Activity assignments.

  • Are the individual activity parameters mandatory?

  • Support Enginatics

    The report allows you to specify up to five activity parameters (p_activity1 through p_activity5). You must enter the desired Cost Type to report.

  • If I need a flexible report to analyze item costs broken down by many different criteria (Element, Sub-Element, Operation, Department), is there a more general report set?

  • Support Enginatics

    Yes, the CST Item Cost Reports acts as a flexible set, offering numerous reporting options like ‘Element by Sub-Element’, ‘Activity by Department’, and ‘Operation by Activity’.