Home › Discussions › Questions & Answers › Identifying Cost Rollup Configuration Errors

Identifying Cost Rollup Configuration Errors

Avatar photoCustomer Questions & Answers 7 replies

We need to identify items where the make/buy control settings conflict with costing settings, potentially leading to zero costs during rollup. For example, a make item set for rollup but missing a BOM or Routing.

7 replies

  • Support Enginatics

    You need the CAC Cost Rollup Controls Validation report. This report compares item make/buy controls versus costing based on rollup controls to find errors in your cost rollup results.

  • How many specific validation checks are included in this report?

  • Support Enginatics

    There are twelve included reports. Examples include: ‘Based on Rollup Yes – No BOMS’ (finds make items set for rollup but missing BOMs, potentially rolling up to zero cost) and ‘Based on Rollup Yes – Buy Items’ (finds buy items set to be rolled up).

  • If I want to run the specific check for items that are not set to be rolled up but still have BOMs or Routings defined, which internal report type should I reference?

  • Support Enginatics

    That scenario is covered by ‘Based on Rollup No – With BOMS’, which finds make items not set for rollup but where BOMs or routings exist.

  • What parameters are mandatory for running this entire set of validation checks?

  • Support Enginatics

    The mandatory parameter is ‘Cost Type’ (Frozen or Pending).

  • You must be logged in to reply to this post.