WIP Job & Variance Analysis Copy link
Plugin: Blitz Report Excel Add-in Skills (
br-wip-variance-analysis)Works with: Claude in Excel, Microsoft 365 Copilot in Excel
Analyze Oracle EBS WIP job health and cost exposure in Excel: have the br-run-reports skill extract job statuses, WIP value, and component shortages, then rank stuck and past-due jobs, surface value concentration and close candidates, and build one WIP analysis dashboard.
When to use it
- Use when the user asks about open WIP jobs, jobs past due, WIP value, discrete job aging, component shortages, or which jobs should be closed.
- Download the skill zip. br-wip-variance-analysis.zip
- In Claude in Excel open Customize > Skills > Create skill and upload the zip.
- Connect the Blitz Report Excel add-in to your Oracle EBS instance, then ask Claude for the task in your own words.
- Download the skill folder from GitHub. br-wip-variance-analysis
- Copy the folder into Documents/Copilot/Microsoft Excel/Skills in your OneDrive.
- Open Excel with the Blitz Report add-in connected and ask Copilot for the task.
- Add the Enginatics marketplace in Claude Code.
/plugin marketplace add enginatics/ai-skills - Install the Excel add-in skills plugin.
/plugin install blitz-report-excel-addin-ai-skills@enginatics - Run the setup skill; it installs or updates the skills in Claude in Excel or Microsoft 365 Copilot in Excel.
/blitz-report-excel-addin-ai-skills:excel-skills-setup
Requirements: Blitz Report and the Blitz Report Excel add-in, connected to your Oracle EBS instance, plus Claude in Excel or Microsoft 365 Copilot in Excel.
🚨 Blitz data = Excel worksheet UDFs, not MCP tools/connectors. Extract data only by writing
=br_...()into a cell (viaexecute_office_js) and reading the spill — nevertool_searchforbr_*, neverrefresh_mcp_connectors, and never conclude "no Oracle EBS / Blitz connector is set up" (the Blitz Report add-in is an Excel add-in, not an MCP connector, so it never appears in the connector list — its absence there is expected). Load the extraction mechanism first:read_skill("br-run-reports").Performance: Read
br-analytics-standardsat the start of every run (read_skill("br-analytics-standards")). All pipeline steps must follow those rules. Target runtime: under 7 minutes.
Produce a WIP health analysis in one workbook: which jobs are stuck, where the value sits, what blocks completion, and which jobs are ready to close. You own scoring and the register; br-run-reports does extraction and br-data-dashboard the build. Run steps in order, keeping intermediate sheets. Unclosed complete jobs are also a period-close drag — hand that verdict to br-inv-cost-close-readiness when this run feeds a close assessment.
Requires: br-run-reports, br-data-dashboard.
Division of responsibility — READ FIRST
You do NOT run Blitz reports yourself. Extraction is by br-run-reports; never call br_* functions or touch a result sheet mid-run. Read-and-recommend only — this skill never closes a
job, changes a status, or transacts material; it ranks and recommends.
When to use
"Which WIP jobs are stuck", "WIP value by job", "jobs past their completion date", "what's blocking the shop floor", "which jobs can we close", "WIP aging". For creating/updating jobs, the WIP Job Upload exists — different skill territory, do not act here.
Inputs
- Organization Code (manufacturing org) — required. (Optional: schedule group, assembly, status filter.)*
Reports used (authoritative names — do NOT broad-search for them)
Pass the documented name directly; search only on #BLITZ_REPORT_NOT_FOUND.
| Report (exact name) | Run with | Notes |
|---|---|---|
WIP Entities | Org | The job register — every job with status and dates. The driver for aging and close-candidate logic. |
WIP Value (or WIP Value Summary for big orgs) | Org (+ period as offered) | $ in WIP per job — costs charged vs relieved; the exposure driver. |
WIP Discrete Job Shortage | Org | Component shortages per open job — the "why is it stuck" evidence. |
WIP Account Distribution (add-on — cost-variance breakdown) | Org + period (+ variance accounts) | The variance evidence for the opt-in add-on below — never wide-open. |
WIP Completion Report (add-on, evidence) | Org + job | Completion quantities when a variance needs the yield side checked. |
CONFIG
Job classes
| Condition (from the register + value) | Class | Recommendation |
|---|---|---|
| Status Complete / Complete-No Charges, not Closed, past completion date | Close candidate | Close the job — every open period it stays open, its variances wait |
| Released, past scheduled completion by > aging threshold, still carrying value | Stuck | Investigate — shortage? (join WIP_Shortages) no recent activity? |
| Released, past due, with open shortages | Blocked | The shortage list IS the action — expedite or de-schedule |
| Unreleased older than threshold | Review | Cancel or release — planning hygiene |
| On Hold | Review | Confirm the hold is intentional |
| Released, on schedule | Healthy | — |
Defaults (edit to the customer): aging threshold 14 days past scheduled completion; unreleased threshold 30 days; value floor for ranking $1,000.
Output sheets & tab order (left to right)
WIP_Analysis (first), Job_Register (every job, classed and ranked), WIP_Jobs (the entities
extract), WIP_Value, WIP_Shortages, [WIP_Accounts] (last).
Pipeline
- Extract — DELEGATE. br-run-reports runs
WIP Entities→WIP_Jobs;WIP Value(Summary for large orgs) →WIP_Value;WIP Discrete Job Shortage→WIP_Shortages. Wait for each. - Anchor. Record open-job count by status, total WIP $, past-due count, shortage-line count, close-candidate count. All healthy → short verdict, skip the heavy register.
- Classify (single
execute_office_jscall). Join value and shortages onto the job register by job name in memory; apply CONFIG classes; rank inside each class by WIP $ descending. WriteJob_Registerin one.values =call: job, assembly, status, class, dates, days overdue, WIP $, shortage count, recommendation. - Dashboard (single call; charts second) (delegate to br-data-dashboard if it fires; else
inline). KPI cards (open jobs, WIP $, past due, close candidates), value-by-class and aging
charts, top-10 stuck jobs table linking to the register. NEW sheet at position 0; don't
rename report sheets; no multi-row
copyToRange; clear strays; widen amount columns. - Narrative. ≤5 bullets: exposure headline, the biggest stuck job and its cause, the close-candidate payoff (jobs × $ that would leave WIP), first action.
- Arrange tabs + final validation. Order per CONFIG;
WIP_Analysisactive. One permitted verification read: register class counts and WIP $ tie to the Step-2 anchor.
Add-on: cost-variance breakdown (OPT-IN — extra extract, offer once before Step 1)
Answers "WHERE is the variance coming from", a different question from job health — so it runs only when the request implies it ("cost variance", "why are variances so high", "variance by job") or the user accepts a single up-front offer. Never re-ask mid-pipeline.
- Extract
WIP Account Distributionfor the org + period alongside the standard pulls. - Decompose per job: charges vs relief by cost element (material / resource / overhead / outside processing) — which element drives each job's net variance, and the org-level pattern (one assembly family, one element, one period spike).
- Driver patterns to call out: material-heavy variance on jobs that also sit on the shortage list (substitutions/over-issue), resource-heavy variance concentrated in one department (rate or routing suspect — hand assembly-level suspects to br-bom-validator for the bill-side check), variance parked on open Complete jobs (the close-candidate payoff quantified).
- Adds a
Cost_Variancesheet afterWIP_Valueand a dashboard section; both degrade cleanly when the add-on didn't run.WIP Completion Reportis pulled per-job only when a yield question needs it — never wide-open. - Variance judgment is a REVIEW flag with the element and $ named — root cause belongs to costing; never assert "the standard is wrong".
Validation
Register ties to raw sheets; every Stuck/Blocked call is backed by a date or shortage the user can
see; jobs missing from the value report show blank $, not zero (say which). When the add-on ran, Cost_Variance element totals tie to the account-distribution extract.
Closed-loop (roadmap, not executed here)
Close candidates route to the WIP close flow; job changes to the WIP Job Upload. This skill recommends; a human executes.