Home › Discussions › Questions & Answers › Scheduling Blitz Reports for background execution

7 replies

  • Support Enginatics

    The recommended method is to run the Blitz Report once from the Run window, and then copy the submitted concurrent request to schedule it.

  • What are the steps to copy and schedule it?

  • Support Enginatics

    First, run the report. Then, navigate to the menu > view > requests > submit a new request > single request. Use the Copy feature to select the request submitted in step 1, update the schedule and delivery options as required, and re-submit it.

  • If I submit a new ‘Blitz Report’ concurrent request manually, how do I ensure the parameters are correct?

  • Support Enginatics

    If submitting manually, you must populate parameters 1 to 87 with values in exactly the same order as they appear on the Blitz Report run window. For example, Parameter3 of the concurrent request must match the third parameter on the run window.

  • What capabilities does scheduling unlock for output?

  • Support Enginatics

    Scheduling allows you to run time-consuming reports during off-hours, and it enables output distribution via Oracle’s delivery options, such as sending the output as an email attachment, or to an FTP location.

  • You must be logged in to reply to this post.