OPM Batches

Description
Categories: Draft
Detail report showing the status of the OPM Batches, including basic information
such as plant code, batch number, batch type (0 for normal batches or 10 for firm planned orders), and batch status.


Batches have many steps which are found in GME_BATCH_STEPS. It's not in the
example query; but, the operation name can be found in GMD_OPERATIONS_B
which is linked by OPRN_ID.
Detail report showing the status of the OPM Batches, including basic information
such as plant code, batch number, batch type (0 for normal batches or 10 for firm planned orders), and batch status.


Batches have many steps which are found in GME_BATCH_STEPS. It's not in the
example query; but, the operation name can be found in GMD_OPERATIONS_B
which is linked by OPRN_ID.

Steps have many activities which are found in GME_BATCH_STEP_ACTIVITIES.

Activities have many resources which are found in GME_BATCH_STEP_RESOURCESS.

Resources have many process parameters which are found in
GME_PROCESS_PARAMETERS. Process parameters is OPM's way of letting the
customer easily store information not designed into the GME schema. Think
of it like a descriptive flex field (not on steroids).

The name of the process parameter can be found in GMP_PROCESS_PARAMETERS.
   more

Download Blitz Report™ – World’s fastest reporting and data upload for Oracle EBS

Contact us to schedule a demo or if you need help with the installation

select --hou.name,
 gbh.plant_code        plant,
 --gmd.*,
 gbh.batch_no          "batch num",
 gmd.item_no,
 gmd.item_desc,
 gmd.line_type_meaning,
 flv.meaning           "Batch Status",
 --trunc(gbh.plan_start_date)   "Plan Start",
 trunc(gbh.actual_start_date) "Actual Start",
 trunc(gbh.due_date) "Due Date",
 --trunc(gbh.plan_cmplt_date) plan_complete,
 trunc(gbh.actual_cmplt_date) "Actual Comp Date",
 ffmb.attribute4 batch_type,
 gbs.batchstep_no,
 gmd.plan_qty,
 gmd.wip_plan_qty,
 gmd.actual_qty,
 -- gbs.plan_step_qty,
 gbs.actual_step_qty,
 gbs.backflush_qty,
 --gbs.plan_start_date,
 --gbs.actual_start_date,
 --gbs.due_date,
 --gbs.plan_cmplt_date,
 --gbs.actual_cmplt_date,
 --gbs.step_close_date,
 gbs.step_status,
 --gbs.priority_code,
 --gbs.priority_value,
 --gbs.delete_mark,
 --gbs.steprelease_type,
 --gbs.max_step_capacity,
 --gbs.max_step_capacity_uom,
 gbs.plan_charges,
 --gbs.actual_charges,
 --gbs.mass_ref_uom,
 --gbs.plan_mass_qty,
 --gbs.volume_ref_uom,
 --gbs.plan_volume_qty,
 gbs.text_code,
 gbs.actual_mass_qty,
 gbs.actual_volume_qty,
 --gbs.quality_status,
 --gbs.minimum_transfer_qty,
 --gbs.terminated_ind,
 gbs.mass_ref_um,
 gbs.max_step_capacity_um
  from gme_batch_header          gbh,
       gme_batch_steps_v           gbs,
       gme_material_details_v    gmd,
       hr_all_organization_units hou,
       mtl_parameters            mp,
       fnd_lookup_values         flv,
       fm_form_mst_b             ffmb
 where 1=1
   AND gbh.batch_id = gmd.batch_id
   AND gbh.batch_id = gbs.batch_id
   AND gbh.organization_id = gmd.organization_id
      -- AND gmd.line_type = '1'
      --AND gmd.line_no = 1
   and gmd.organization_id = hou.organization_id
   and gmd.organization_id = mp.organization_id
   AND flv.lookup_code = TO_CHAR(gbh.batch_status)
   AND flv.lookup_type = 'GME_BATCH_STATUS'
   AND flv.language = 'US'
   AND ffmb.formula_id = gbh.formula_id
  -- and gbh.batch_no = 130810
   and gbs.batchstep_no = 10
 order by 2